How a programme usually runs
A typical engagement starts with a one day site or bench survey, where we record the structure, the existing sensors and the way the machine is used. Within two weeks the client receives a short written baseline with the measured behaviour, the reference options and the budget in mass, power and cost. From there the programme moves through design, build, calibration and acceptance, with a written decision at each gate.
We keep the client engineering team inside the loop rather than behind it. Reviews are working sessions with drawings and data on the table, not presentations with conclusions already fixed. That habit is the reason our acceptance records survive audits years after the project has closed, and it is the reason clients return with the second and third platform rather than rebuilding the relationship from the start.
The same discipline applies to the paperwork. Every alignment report carries the date, the instrument used, the reference standard, the ambient conditions and the residual figure. When asked why a platform behaves as it does, we can point to a page rather than to a memory.